Sunday, November 25, 2012

11/24/12 Falling Creek

Another solid day of work. Randy, John, Chuck, and DJ made it out to help and ride. We added dirt to two berms and two jumps. It was nice when the wind wasn't blowing but when the wind picked up it was pretty chilly. Got down to the last of the top soil, still a little bit left to be scraped up.

berm got some love on the exit

given'r some love.

growing slowly

both jumps got dirt

dirt on lip and landing, should be easier to pump down now.

waiting to be shaped



No comments:

Post a Comment